LDP 2020

GARTNERIET LUNDAGER A/S has installed 3 pcs. PENTA fertilizer systems and two return tanks of 161 m³ to reduce the consumption of nutrients.

Insulating day curtains were also installed in 12,000 square meters at Fangelvej 35 to reduce energy consumption.